A Guide to the Stages of Construction

The stages of home construction can vary depending on the size and complexity of the project, but there are some general stages that most home builds will go through.

The time it takes to complete each stage of home construction will vary depending on the size and complexity of the project, however, the overall process typically takes anywhere from 6 months to 2 years to complete.

Here are the most common stages of home construction:

Stage 1: Clearing the Site

Preparing a building site is the process of clearing, grading, and leveling the ground in preparation for construction. This is an important step in the construction process, as it ensures that the foundation of the building is stable and level. The following are the steps involved in preparing a building site:

Clearing the site: The first step is to clear the site of any existing vegetation, such as trees, shrubs, and stumps. This can be done by hand or with the use of heavy equipment.

Grading the site: Once the site is cleared, it needs to be graded. This involves leveling the ground and creating a slope for drainage. The slope should be away from the building to prevent water from pooling around the foundation.

Compacting the soil: The soil needs to be compacted to ensure that it is stable and will not shift. This can be done by using a roller or a vibrating plate compactor.

Installing drainage: If the site is in an area that is prone to flooding, it is important to install drainage. This can be done by installing a french drain or by grading the site so that water will flow away from the building.

Marking the foundation: Once the site is prepared, the foundation can be marked out. This is done by using stakes and string to outline the perimeter of the foundation.

Stage 2: Pre-construction

The pre-construction stage of building a home is the time when you will make all the important decisions about the design, layout, and materials of your home. This is also the time when you will get the necessary permits and approvals.

Here are some of the things you will need to do during the pre-construction stage:

Choose a builder: This is one of the most important decisions you will make, as the builder will be responsible for the construction of your home.

Choose a design: You will need to choose a design for your home, or work with an architect to create a custom design.

Choose the materials: You will need to choose the materials for your home, such as the type of foundation, framing, roofing, and siding.

Get the necessary permits: You will need to get the necessary permits from the local building department.

Set a budget: It is important to set a budget for your home before you start construction.

Sign a contract: Once you have chosen a builder and agreed on a design, you will need to sign a contract.

The pre-construction stage is a crucial stage in the home building process, as it is the time when you will make all the important decisions that will affect your home for years to come. It is important to do your research and make sure that you are making the best decisions for your needs

Stage 3: Foundation

The foundation stage of a building project is the process of creating the base that the building will rest on. It is an essential part of the construction process, as it ensures that the building is stable and will not collapse.

The foundation stage typically includes the following steps:

Site preparation: The site must be prepared by clearing it of vegetation and grading the ground to ensure that it is level.

Footing excavation: Footings are the parts of the foundation that transfer the weight of the building to the ground. They are typically made of concrete and are buried below the frost line.

Footing installation: The footings are installed by pouring concrete into the excavated holes.

Foundation wall construction: The foundation walls are built on top of the footings and provide support for the rest of the building. They are typically made of concrete or masonry.

Drainage: Drainage is important to prevent water from pooling around the foundation and causing damage. This can be done by installing a french drain or by grading the site so that water will flow away from the foundation.

Once the foundation is complete, the building can be constructed on top of it.

Stage 4: Framing

The framing stage of home construction is the process of creating the skeleton of the home. It is an essential part of the construction process, as it provides the structure for the rest of the home. The framing stage typically includes the following steps:

Layout: The framing plan is laid out on the foundation. This plan shows the location of all the walls, beams, and other framing members.

Cutting and assembling the framing members: The framing members are cut to length and assembled according to the framing plan.

Erecting the framing: The framing members are erected on the foundation and secured in place.

Installing the roof trusses: If the home has a truss roof, the trusses are installed at this stage.

Installing the sheathing: The sheathing is installed over the framing to provide a weather-tight barrier.

Once the framing is complete, the home is ready for the next stage of construction, which is the roofing stage. Use the right materials: The materials used for the framing must be strong enough to support the weight of the home. By following these tips, you can ensure that your framing stage is successful and that your home is built on a strong foundation

Stage 5: Rough-in

The rough-in stage of building is the process of installing the essential mechanical, electrical, and plumbing systems in the building. It is an important stage of the construction process, as it ensures that the building has the necessary infrastructure in place. The rough-in stage typically includes the following steps:

Plumbing: The plumbing system is installed, including the water supply lines, drain lines, and vent pipes.

Electrical: The electrical system is installed, including the wiring, outlets, and light fixtures.

HVAC: The HVAC system is installed, including the ductwork, air handler, and thermostat.

Insulation: The building is insulated to help regulate the temperature and keep the building comfortable.

Fire protection: The fire protection system is installed, including the sprinkler system and fire alarm system.

Once the rough-in is complete, the building is ready for the next stage of construction, which is the finish stage.

Stage 6: Insulation & Drywall

The insulation and drywall stage in construction is the process of installing insulation and drywall in the walls, ceilings, and floors of a building. It is an important stage of the construction process, as it helps to regulate the temperature and sound levels in the building, and it also provides a smooth surface for finishing.

The insulation and drywall stage typically includes the following steps:

Installing insulation: The insulation is installed in the walls, ceilings, and floors of the building. The type of insulation used will depend on the climate and the building's energy efficiency goals.

Hanging drywall: The drywall is hung on the walls and ceilings of the building. Drywall is a type of wallboard made of gypsum plaster sandwiched between two layers of paper.

Taping and mudding drywall: The drywall seams are taped and mudded to create a smooth surface. Taping is the process of applying a thin layer of joint compound to the seams between the drywall sheets. Mudding is the process of applying a thicker layer of joint compound to the seams and other areas of the drywall to create a smooth finish.

Texturing drywall: The drywall may be textured to create a different look. There are many different types of drywall texturing, such as orange peel, knockdown, and skip trowel.

Once the insulation and drywall stage is complete, the building is ready for the next stage of construction, which is the painting or wallpapering stage.

Stage 7: Finishing

The finishing stage of construction is the final stage of the construction process. It is the process of adding the finishing touches to the building, such as painting, flooring, and installing fixtures. It is an important stage of the construction process, as it makes the building look its best and ready for occupancy. The stage includes:

Painting: The walls and ceilings are painted. The type of paint used will depend on the climate and the building's style.

Flooring: The flooring is installed. The type of flooring used will depend on the budget and the building's style.

Installing fixtures: The fixtures are installed, such as light fixtures, faucets, and doorknobs.

Landscaping: The landscaping is completed. This may include planting trees, shrubs, and flowers.

Once the finishing stage is complete, the building is ready for occupancy. Choose the right materials: The materials used for the finishing should be durable and able to withstand the elements. By following these tips, you can ensure that your finishing stage is successful and that your building is ready for occupancy.

The finishing stage is an important stage of the construction process, as it makes the building look its best and ready for occupancy. It is also a challenging stage, as it requires coordination between the different tradespeople. By following the tips above, you can help ensure that your finishing stage is successful

Stage 8: Final inspection

The final inspection stage of building is the last stage of the construction process. It is the process of inspecting the building to ensure that it meets the local building codes and the specifications set out in the building contract. The inspection includes:

Inspecting the structure: The structure of the building is inspected to ensure that it is sound and able to withstand the elements.

Inspecting the finishes: The finishes of the building are inspected to ensure that they are complete and meet the standards set out in the building contract.

Inspecting the systems: The systems of the building are inspected to ensure that they are working properly. This includes the plumbing, electrical, and HVAC systems.

Inspecting the documentation: The documentation of the building is inspected to ensure that it is complete and accurate. This includes the building plans, specifications, and permits.

Once the final inspection is complete, the building is ready for occupancy.

Would you like to find out how to turn your architect designed home into a Gablok sustainable home?

Building a Gablok home is a team effort between you (the owner-builder), Gablok (the manufacturer) and the tradesmen who will finish off your home. All it takes is a phone call and you could be in your Gablok home in weeks, not months.